NCDOT to work on bridge near North Topsail Beach - WRBL

NCDOT to work on bridge near North Topsail Beach

Posted: Updated:
RALEIGH, N.C. -

Motorists heading to North Topsail Beach will be experiencing delays as bridge preservation work begins on the N.C. 210 bridge over the Intracoastal Waterway.
    
The N.C. Department of Transportation says nightly lane closures will continue from 7 p.m. until 6 a.m. through the end of November. In addition, daytime lane closures will occur from 8:30 a.m. until 4:30 p.m. Monday through Thursday, weather permitting.
    
The existing bridge was built in 1968, and maintenance and preservation are needed to keep the bridge in good condition.  Crews are using high-powered jets of water to remove any deteriorated concrete. When that's done, crews will place a layer of latex-modified concrete on the bridge's surface.
    
Crews will also repair the bridge's concrete supports.

Powered by WorldNow

1350 13th Avenue
Columbus, GA 31901

Telephone: 706.323.3333
Fax: 706.327.6655
Email: news@wrbl.com

Can't find something?
Powered by WorldNow
All content © Copyright 2000 - 2014 Media General Communications Holdings, LLC. A Media General Company.