NORTH CAROLINA: Duke Energy told to submit coal ash repair plans - WRBL

Duke Energy told to submit coal ash repair plans

Posted: Updated:
Cliffside Steam Station, located on the Rutherford and Cleveland County line. (Duke Energy) Cliffside Steam Station, located on the Rutherford and Cleveland County line. (Duke Energy)
  • Coal Ash SpillMore>>

  • Coal ash bill in limbo after NC Senate adjourns

    Coal ash bill in limbo after NC Senate adjourns

    Friday, August 1 2014 5:38 AM EDT2014-08-01 09:38:10 GMT
    The North Carolina Senate adjourned early Friday morning without finalizing a bill requiring Duke Energy to clean up its leaky coal ash dumps across the state.
    The North Carolina Senate adjourned early Friday morning without finalizing a bill requiring Duke Energy to clean up its leaky coal ash dumps across the state.
  • Environment group says public 'mislead' to think Dan River is clean

    Environment group says public 'mislead' to think Dan River is clean

    Friday, July 18 2014 2:06 PM EDT2014-07-18 18:06:07 GMT
    Waterkeeper Alliance says photos show coal ash is still present in the Dan River. (Waterkeeper Alliance)Waterkeeper Alliance says photos show coal ash is still present in the Dan River. (Waterkeeper Alliance)
    Waterkeeper Alliance provided photos it says show deposits of coal ash still in the Dan River despite claims to the contrary.
    Waterkeeper Alliance provided photos it says show deposits of coal ash still in the Dan River despite claims to the contrary.
  • NC, Va. groups to monitor coal ash in Dan River

    NC, Va. groups to monitor coal ash in Dan River

    Friday, July 18 2014 9:59 AM EDT2014-07-18 13:59:45 GMT
    A collapsed pipe at Duke Energy's Dan River Steam Station dumped coal ash into the Dan River.A collapsed pipe at Duke Energy's Dan River Steam Station dumped coal ash into the Dan River.
    Two water protection groups will continue to monitor the Dan River to identify coal ash from a massive spill in North Carolina that flowed into Virginia.
    Two water protection groups will continue to monitor the Dan River to identify coal ash from a massive spill in North Carolina that flowed into Virginia.
RALEIGH, N.C. -

A North Carolina environmental agency is ordering Duke Energy to submit plans to repair leaky pipes at dams holding back millions of tons of coal ash at five power plants.

The state Division of Energy, Mineral and Land Resources on Monday issued Duke eight notices of deficiency for leaks at the Marshall, Riverbend, Allen, Buck and Cliffside plants.

Duke Energy has until July 17 to submit repair plans.

State regulators ordered the company to video the insides of pipes at the waste pits after a massive coal ash spill at a Duke plant on Feb. 2 coated more than 70 miles of the Dan River in toxic sludge.

Agency director Tracy Davis says the leaky pipes pose no imminent danger to the public or they'd have taken immediate action.

Copyright 2014 The Associated Press. All rights reserved.

Powered by WorldNow

1350 13th Avenue
Columbus, GA 31901

Telephone: 706.323.3333
Fax: 706.327.6655
Email: news@wrbl.com

Can't find something?
Powered by WorldNow
All content © Copyright 2000 - 2014 Media General Communications Holdings, LLC. A Media General Company.